Skip to content

Pricing

Annual maintenance contracts are priced by property type. Renovation is quoted per project. Everything below is in UAE dirhams, excluding 5% VAT.

Annual maintenance contracts

One contract covering the whole property for twelve months.

Studio / small apartment

AED 1,800

per year + VAT

1–2 BR apartment

AED 3,900

per year + VAT

Most popular

3 BR / small villa

AED 6,900

per year + VAT

Townhouse (3-bed)

AED 7,900

per year + VAT

Villa (4–5 bed), premium

AED 9,900

per year + VAT

Included in every contract

  • 3–4 AC services per year — filter, coil wash, gas check and drain clearing
  • Plumbing leak and fixture repairs
  • Electrical switch and breaker work
  • 2–4 pest treatments per year
  • Minor painting and handyman touch-ups

Billed separately

Stated up front so there are no surprises on the invoice. These sit outside the contract price:

  • Parts and major component replacement, at cost plus 20%
  • Full rewiring
  • Waterproofing
  • After-hours callouts, at a flat AED 150 surcharge

Prefer to pay per visit?

No-contract callouts are available. A contract works out cheaper from roughly the tenth visit onward, and it gets you a guaranteed response time.

Starting from AED 199per visit + VAT

AED 208.95 incl. VAT

Covers the first 90 minutes on site. Runs longer? It's AED 99 per additional hour after that — we'll always tell you before continuing.

Money-back guarantee

Renovation

Finish levels are priced per square foot. Whole-project scopes are quoted as a fixed price against an agreed specification.

RenovationPricingTypical timeline
Standard finishAED 200 per sqft
Premium finishAED 300 per sqft
Luxury finishAED 400 per sqft
Partial refresh — kitchen, two bathrooms and paintAED 220,0006–8 weeks
Full villa renovationAED 450,0008–14 weeks

Prices exclude 5% VAT.

Permits and approvals

Cosmetic and paint work generally needs no permit. Structural, electrical, plumbing or AC work needs a building-management NOC — usually 5 to 7 days — plus a Dubai Municipality permit, typically 10 to 12 working days. We apply for both on your behalf and build the lead time into the schedule. Unpermitted work risks fines of up to AED 50,000 and a stop-work order.

Get it in writing

Send us your property details and we will come back with a written quote against these rates.